| From placing the piers to finished
roof took 9 days to frame. |
The pre-engineered columns for an
elevated house, 42 feet high. |
| |
|
 |
 |
| First floor construction, with 6
ft. cantilevered floor. |
Second floor installed with 6 ft.
cantilever. |
| |
|
 |
 |
| Pre-engineered roof beam. |
Installation of 32 ft. clear span
roof panels. |
| |
|
 |
 |
| The house welded as a single unit. |
Nearing completion. |